Hazelwood Drive Sewer Replacement – City of Oregon City

Upsize existing pipes using open trench and horizontal directional drilling (HDD) installation methods. The work will reroute the new sewer main out of sensitive backyards into the street right-of-way

Construction of approximately 1450 linear feet of 12-inch and 14-inch sewer main via open-cut and trenchless methods to replace and reroute an existing undersized gravity sanitary sewer main.
Replacement of approximately 10 sewer laterals.  Construction of up to eleven (11) 48-inch manholes.