Tag Archives: utilities

Hazelwood_Drive_Sewer

Hazelwood Drive Sewer Replacement

City of Oregon City Contract Amount $849,485 Upsize existing pipes using open trench and horizontal directional drilling (HDD) installation methods. The work will reroute the new sewer main out of sensitive backyards into the street right-of-way Construction of approximately 1450 linear feet of 12-inch and 14-inch sewer main via open-cut and trenchless methods to replace …

Read more

Sherwood - Division Street

SE Division & SE Orcutt Storm Sewer & Pavement Rehab

City of Sherwood Contract Amount $587,963 This project consisted of installation of storm sewer 10″ and 6″ HDPE pipe, asphalt removal, cement treatment of base, manhole installation, stormwater management, erosion control, asphalt concrete pavement, installation of new concrete sidewalk and curb, traffic control and restoration.

Charbonneau_Utility_Repair

Charbonneau High Priority Utility Repair – City of Wilsonville

Contract Amount $921.783   Charbonneau HP Utility Repair – City of Wilsonville All labor, equipment and materials for the open trench replacement of 2500 lineal feet of storm pipe, between 10″ and 18″ diameter, cure in place installation of approximately 1500 lineal feet of storm pipe between 12″ and 18″ diameter, replacement and restoration of …

Read more

Corps_US_Moorings_Paving

US Moorings Warehouse Paving

US Army Corps of Engineers Contract Amount $76,999 Concrete pavement repair.  Asphalt paving.  Evacuation driveway and drain line repair.

Albert_Kelly_Stream_Daylighting

Albert Kelly Stream Daylighting

City of Portland Contract Amount $150,000 City of Portland – Albert Kelly Stream Daylighting Storm pipe removal. Construction of stream channel and riparian buffer.  Install new stream bed and habitat Construction of new stream channel  

East_Tigard_Sewer

East Tigard Sewer Improvements

City of Tigard Contract Amount $1,533,595 Installed 1200 lineal feet of new sanitary sewer line and manholes along and across a Fanno creek tributary for the City of Tigard.  Project involved treatment and removal of contaminated media treatment, bypass pumping, turbidity monitoring, wetland and vegetative plantings restoration

Forest_Park_Culvert_Emergency

Forest Park Emergency Culvert Repair-City of Portland Bureau of Environmental Services

  • 10, 15, 2011
  •  
  •  Culverts
  • Comments Off on Forest Park Emergency Culvert Repair-City of Portland Bureau of Environmental Services

Contract Amount $149,382

Miles_Place_Pump

Miles Place Pump Station

City of Portland, Bureau of Environmental Services Contract Amount $182,228  

Parker_Woods

Parker Woods Subdivision

Roundstone Properties Contract Amount $720,487 Parker Woods Subdivision presented a unique challenge of crossing the lake on the property to connect the sewer to city services during a very wet winter.

Skyland_Drive

Skyland Drive